Since we moved in we have been doing various projects on the "new" house. (I say new house lightly since our house was built in 1869.) We have so far successfully redesigned/redecorated / remodeled 6 rooms so far. It has been a lot of work, but we have certainly enjoyed seeing the transformation of this house into our new home.
The first project we worked on was the mud room. When we viewed the house the previous owners were using this mud room off of the kitchen as a storage room. It had no use, and it was so ugly. With a new fresh coat of paint, and a few great finds from local antique stores, we were able to transform the ugly mud room to the newly designed, functional mud room for the Anderson's.
Before we moved in as the previous owners had it
The Mud room when we first moved in.

Mud room after...fresh coat of paint...a few decorations here and there, and the room was transformed!

The next project (meaning the next weekend) we tackled was the half bath. Right when I saw this bathroom during the first viewing of the house, I knew what I was going to do with it. I had this vision of what I wanted, with some hard work by both Sean and me, the bath turned out exactly how I had planned. Sean and I ripped down the existing wallpaper,ripped out the 1980s wall mounted sink, and replaced it with a new pedestal sink with new hardware, and replaced the existing non-functioning light fixture. We basically gutted the entire half bath, the only items that stayed were the floors and the toilet, (however the toilet got a brand new seat, and handle).
Half Bath Before


Half Bath After

2 comments:
Jen! It looks amazing! LOVE IT!!!!
Btw, how do you get the different font on your blog?
Looks great! Wish we could see it in person. Can't wait to see the rest of the photos!
Post a Comment